DETAILS FOR SPECIFICATION

Structure Reinforced Cement Concrete framed structure
Roof Reinforced Cement Concrete roof with weathering course. High Quality pressed tiles for terrace.
Walls 9 inch Brick work for outer walls and 4.5 inch thick brick work for internal panel walls.
Doors Main doors will be of Teak wood Frame with ready made Panel door. Other doors with Contry wooden frame with water proof doors with Enamel paints.
Windows Good Quality of Country wood Frames shutters with glazing and M.S.Grills
Kitchen Stainless Steel sink and Polished Granite top for Kitchen Platform .
Wall Tiles Kitchen Glazed tiles to a height of 2 ft( Two feet over the counter) Toilet Glazed tiles to a height of seven feet.
Flooring Inner Carpet area will be provided with 24* 24 Vitrified tiles (Cost- 40 Rs / sft).
Ward Robe Each bedroom and Kitchen with one loft at any one side of the room.
Ward Robe / Cup Board in all bed rooms. Kitchen with Cuddapah slabs without shutters.
Locks Main Doors to have a Godrej Lock with safety chains and magic eye. All other bedrooms doors has lock with handle.
Sanitary Fittings One Water Closet of Orrisa pan in common toilet
Two Wash Basin’s size 16*22 in common toilet and in Dining( PARRYWARE/JOHNSON )
Taps & shower heads are in each toilet
EWC at toilet in Bedroom with high level flush tank ( PARRYWARE/ JOHNSON)
Paintings Birla wall care putty with Asian Ace Interior Paints Emulsion for inner walls
Weather proof paint for all Exterior walls.
Electrical Two Fan points, Two Light points and three 5Amps plug socket provided in Living and Dining.
5 Amps Socket near Bed Head in all Bed rooms. Four 5 Amps plug Socket and two 15 Amps plug Socket provided in the Kitchen.
One 15 Amps plug Socket point and one 5 Amps and One Exhaust fan point provided in the toilets.
AC points provided in all Bed rooms. Telephone points, Cable, T.V points will be provided in Living and Master Bed room.
All switches and sockets are of Elles modular
Three Phase power supply with Independent Meter. (Extra )
   
PAYMENT SCHEDULE
While Agreement time 15%
While basement completion 25%
while Completion of brick work 20%
while respective Roof completion 20%
While hand over 15%
While hand over 5%
TOTAL COST 100%
Coalesse